CS297-298 Project News Feed
Corrections on thesis
(Posted on Fri, 06 May 2005 16:18:48 PDT
.)
- Meeting with advisor and committee and discussed my thesis;
- Followed the advisor and committee advice to reedit the thesis;
- Correct the grammer errors in the thesis;
- Adding estimate complete time function to the code;
- Making draft for the slides;
- Reformat the papers
|
Code documentation
(Posted on Tue, 26 Apr 2005 10:35:28 PDT
.)
# restructure the code and make the comments and documentation on that;
# recollect the test data for report;
# make up test plan for yearly performance test.
|
CS298 report
(Posted on Wed, 20 Apr 2005 23:25:15 PDT
.)
- Adding yearly performance into the program;
- Collect the data and analysis;
- Make 298 report
to do::
- recollect the test case data and modify the report
|
Linear or Exponential
(Posted on Tue, 12 Apr 2005 16:39:22 PDT
.)
* Add one more test case for budget changes affecting the scheduling results (same internal, different ammounts; same amount, different intervals);
* Ten years period, split into years and calculate the AAFT and AAS;
* Thesis writing disscussion.
|
Test and Analysis
(Posted on Mon, 11 Apr 2005 22:57:01 PDT
.)
- Test the superASH by changing the number of the jobs, applying different queue models, adding different incoming budget interval and amounts;
- Make the results in EXCEL files;
- Analyze the results;
- Outline the thesis.
|
April 4
(Posted on Mon, 11 Apr 2005 22:39:59 PDT
.)
- Schedule the tasks for the report and test;
- Disscuss the new configuration parameters
- Queue Model;
- Job number;
- Budget;
- Adding another performance parameter AAFT and AAS to the program
|
Repost March 29
(Posted on Mon, 11 Apr 2005 22:36:10 PDT
.)
- Change the job costs applicable according to researches;
- Change the intervals and amounts of monthly incoming budget;
- Follow the testing plan to test the ASH algorithm.
|
Testing Plan
(Posted on Mon, 21 Mar 2005 11:20:18 PST
.)
* Come up with detailed testing plan and test the ASH version one;
* Modify the price of each job and make them applicable;
* Add another characteristic to the job type -- regular or unregular.
|
Goals of ASH
(Posted on Tue, 08 Mar 2005 16:13:39 PST
.)
* Add emergence job
* Add budget account
To -> Maximize saving and minimize the average flow time and average strech
|
Analysis on Test Results
(Posted on Tue, 01 Mar 2005 22:45:39 PST
.)
- According to the results, the basic ASH algorithm is better than FIFO;
- More study on the width of the queues;
- Add budget consideration into the algorithm.
|
Adding performance parameters and Testing - week 4 &5
(Posted on Sun, 27 Feb 2005 22:07:13 PST
.)
1. Average Flow Time;
2. Average Stretch;
3. Total Turnaround;
4. Completion Time;
5. Finish Time.
|
Implement the improved ASH algorithm -week 2&3
(Posted on Sun, 27 Feb 2005 22:03:54 PST
.)
1.Deploy with the improved ASH algorithm in Java;
2.Considerations on Markov Hiden Chain theory;
3.Study the performance of the ASH algorithm.
|
Disscussion on ASH algorithm
(Posted on Sun, 27 Feb 2005 22:00:07 PST
.)
1.one administrator+ several contractor;
2.preemptive->non-preemptive;
3.add job types to each job according to relative contractor;
4.apply approximate processing time.
|
CS297 final report and X10 scheduler
(Posted on Mon, 13 Dec 2004 11:52:19 PST
.)
-Make CS297 report by this week;
-Finish the X10 scheduler.
|
Comparison in scheduling aglorithms
(Posted on Mon, 29 Nov 2004 10:49:08 PST
.)
Done:
- Greedy and improved greedy algorithm;
- Semi-clairvoyant R algorithm, FIFO and SPF;
-Turned in the deliverable two (Nov 18,2004).
To do:
- Add descriptions to the codes;
- Start the X10 study.
|
Semi-clairvoyant R algorithm
(Posted on Tue, 16 Nov 2004 09:53:11 PST
.)
- Implemented the R algorithm;
- Tested the data by random generator;
- Further research on R algorithm;
- Keep working on simulate real-time job scheduling in Greedy algorithm.
|
Semi-clairvoyant algorithm
(Posted on Tue, 02 Nov 2004 15:19:33 PST
.)
1.Figured out the R-algorithm by applying semi-clairvoyant.
2.Compared the Greedy, modified greedy, FIFO, SPF and R-algorithm.
3.To modify the Greedy algorithm and simulate the real-time job queuing.
4.To implement the R-algorithm and FIFO, SPF algorithms.
|
Testing variants
(Posted on Wed, 13 Oct 2004 09:15:12 PDT
.)
Done list:
1)Basic Greedy-bubble-scheduling implementation,
2)Basci Greedy-quick-scheduling implementation;
To do list:
1)Summary on research on scheduling algorithms;
2)Improve the scheduling algorithm, and add EDD to it.
|
Installed software
(Posted on Mon, 20 Sep 2004 15:44:45 PDT
.)
MySQL 3.23.54-nt
Apache 1.3.27
PHP 4.3.0
1)Created the database and table
2)Create the users and priorities
3)Built up the user interface
4)Trough the user interface to load data and research the database.
|
August 24 Meeting
(Posted on Wed, 25 Aug 2004 10:34:39 PDT
.)
1.Debug the bugs in the PHP and HTML codes;
2.Discusss the deliverable one, and come up with the design requirements;
3.Set up an account for posting the BLOG entry;
4.Talk about the HOA website design sketch.
5.Arrange this semester meeting time.
|