CS 116A Grades

 

Section 1

 

ID

Q1

Q2

Q3

Q4

Q5

HW1

HW2

HW3

Project

MT1

MT2

Final

Total

Letter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

1

1.5

0

0

1.5

5

2.5

13.5

12

20

17

23

71.18182

B-

1

0.5

1

0.5

1

0

0.5

5

11

0

23

11.5

0

36.75

F

2

1.5

1.5

1

2

0.5

5

3.5

11

10

27

29

19.5

77.29545

B

3

0

2

1.5

1

1

5

1

9

9

20

30

33

77

B

4

1

0.5

2

2

2

5

2.5

0

7

17

0

31.5

51.97727

D+

5

0.5

0.5

0

0

1.5

0.5

1

8

12

18

18

30

62.45455

C

6

2

0

1.5

0

0

5

5

11

11

17

26

31.5

78.47727

B

7

1

0

0

0

2

5

5

13.5

10

18

26

43.5

88.15909

A-

8

1

1.5

1.5

2

2

5

5

11

10

20.5

26

43.5

91.90909

A

9

1

0.5

1

2

1

5

5

11

11

20

24

39.5

86.43182

A-

10

0

1.5

0

0

0

5

1

0

0

23

0

0

19

F

11

0.5

1.5

2

1

0

5

5

11

12

27

24

23

79.18182

B

12

0

1

1

2

1

0

0

13.5

10

20

20

33.5

71.34091

B-

13

0

1.5

1

1

2

5

5

11

9

20

27.5

39

85.84091

A-

14

0.5

2

0

2

1

3

2.5

11

7

25.5

21

25

69.29545

C+

15

1

2

2

2

1.5

5

5

11

12

27

26.5

38

94.15909

A

16

1

1.5

1

2

2

5

5

11

12

25.5

28

41.5

95.54545

A+

17

0.5

0

0.5

0.5

0

5

1

0

7

14

11.5

0

27.25

F

18

1.5

1.5

2

2

2

1.5

5

13.5

7

25.5

26

0

61.75

C

19

0

0

0.5

0

0

5

0

9

12

25.5

16

19.5

60.54545

C

20

0

1

0.5

0

1

0

0

0

12

15

21

33

55

C-

21

0.5

0.5

0.5

1

2

5

3.5

11

11

26

20

31.5

79.47727

B

22

0.5

0.5

0

0.5

0

1.5

3.5

13.5

7

14

15

0

41.5

D-

23

1

0.5

0.5

1

1

5

5

11

10

16.5

15

21

65.06818

C+

24

1

0

0.5

1

0

5

0

0

10

20.5

21

19.5

51.54545

D+

25

0.5

1.5

1

2

1.5

5

5

11

11

25.5

16

25

76.29545

B

26

0

0.5

1.5

1.5

2

0

1

9

7

20.5

24

43.5

74.40909

B-

27

1

1.5

2

0

1

5

5

11

0

27

30

41.5

83.29545

B+

28

0.5

1.5

1.5

0.5

1

1.5

0

11

9

23

29

31.5

73.97727

B-

29

1.5

1

1

2

2

0.5

3.5

9

12

27

11.5

33

74.25

B-

 

Section 2

 

ID

Q1

Q2

Q3

Q4

Q5

HW1

HW2

HW3

Project

MT1

MT2

Final

Total

Letter

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

1.5

0.5

2

1.5

2

5

5

12.5

9

17

6.5

41.5

79.04545

B

1

0

0

1.5

0.5

2

5

2

11

12

27

8

33.5

74.34091

B-

2

2

1

0

0

1

5

2

14

10

23.5

27

19

73.20455

B-

3

1.5

2

1

0.5

2

0

4.5

8

7

18

8.5

39.5

66.68182

C+

4

2

1.5

0.5

1

1

5

1.5

10

10

20

16.5

44

80.75

B+

5

2

0.5

1

0.5

2

5

5

12.5

12

29.5

27

38

94.65909

A

6

0

0

0.5

0.5

0

5

3

11

9

17

6.5

12

48.93182

D

7

1.5

0.5

1.5

2

2

5

5

10

12

27

21

32.5

85.65909

A-

8

1.5

1

1.5

0

2

5

4

14

12

24.5

29.5

42

96.63636

A+

9

0

1

0

2

2

5

4

8

9

27

18.5

29.5

73.86364

B-

10

2

1

0

0.5

2

4

4

8

9

20

15.5

31

69.38636

C+

11

1.5

1.5

1.5

1

2

5

5

11

9

26.5

26.5

35

87.86364

A-

12

2

0.5

1.5

0.5

2

5

4.5

12

12

22.5

20

41.5

89.54545

A-

13

0.5

0.5

0

0.5

1

5

5

8

9

20.5

15.5

33.5

70.34091

B-

14

1

0.5

0.5

0

1

5

2.5

11

9

22

8.5

19

58.70455

C-

15

1

1

1.5

1

2

5

5

14

12

24.5

26

39.5

94.68182

A

16

2

1.5

2

2

2

5

5

14

12

27.5

28

44

103.25

A+

17

2

0.5

1

1

2

5

3

12

7

19

24.5

32.5

77.40909

B

18

1.5

1.5

1.5

0

1

5

5

12.5

10

20.5

16.5

30.5

77.29545

B

19

2

1

2

0

1

5

5

14

9

22.5

21

41

88.70455

A-

20

1

0.5

1

0.5

2

5

3

14

7

18

8

25

64.04545

C

21

2

2

0

2

2

5

5

12

12

23

31

37

94.22727

A

22

0

1.5

1.5

0

2

5

5

10

12

22

24

34

83.18182

B+

23

2

1

2

0.5

2

5

5

14

12

23.5

17.5

42

92.63636

A

24

0.5

2

1.5

0

0

5

5

14

10

23

23

43

90.31818

A

25

0

0

0

0

0

0

0

0

0

0

0

0

0

F

26

2

1

1.5

0.5

2

5

5

14

10

24.5

30

42.5

97.22727

A+

27

2

1.5

2

1

2

5

5

14

9

25.5

25

34

89.93182

A-

28

0.5

0

0

0

0

5

0

0

0

0

0

0

0.5

F

29

0.5

1

0

0

0

0

0

0

7

0

29.5

34

46.43182

D