Chris Pollett > Students >
Swathi

    ( Print View )

    [Bio]

    [Project Blog]

    [CS297 Proposal]

    [Cakephp Tutorial[PDF]]

    [Deliverable 1:CakePHP]

    [Deliverable 2:JavaScript Frameworks]

    [Deliverable 3: Drag and drops]

    [Deliverable 4: Layout of the IDE]

    [CS297 Report [PDF]]

    [CS298 Proposal]

    [CS298 Report [PDF]]

    [CS298 Presentation [PDF]]

    [CS298 Code]

                          

























CS297-298 Project News Feed

Date Discussion Feedback Future work
Nov 23, 2010 Integrated with the model component and updated some functionalities Work on the tools and implement both the library and attribute panel for the tags discussed. complete report.
Nov 9, 2010 Implemented all the tools and done with save and edit. Fix the closure problem and work on design and edit modes integration. start writing report and fix some bugs.
Nov 2, 2010 Updated the GUI with a tabbed interface Work on the tools and implement both the library and attribute panel for the tags discussed. Work on the tools for views.
Oct 26, 2010 Integrated the model component, updated the view tools Work on the tools and implement both the library and attribute panel for the tags discussed. Work on the tools for views and improvise with ajax calls.
Oct 19, 2010 Updated the GUI with a tabbed interface Work on the tools and implement both the library and attribute panel for the tags discussed. Work on the tools for views.
Oct 12, 2010 Updated the GUI with a tabbed interface Work on the tools and implement both the library and attribute panel for the tags discussed. Work on the tools for views.
Oct 5, 2010 Integrated the editor and Showed the working tool library on the IDE Work on the tools and implement both the library and attribute panel for the tags discussed. Work on the tabbed interface and tools for views.
Sep 28, 2010 Showed the working file structure on the IDE and implemented the Label tag functionality. Integrate the editor and make one tool component work. Implement the structure for the tools.
Sep 21, 2010 Showed the working file structure on the IDE Work on the File tab in the navigation of the projects and integrate the editor and make one tool component work. work on the navagation and embed the text editor and build and implement the structure for the tools.
Sep 14, 2010 Showed the working project of the IDE Work on the tree-view of the projects and getting the editor stuff working. work on the UI and embed the text editor and get the highlight.js file working
Sep 7, 2010 Discussed the project architecture. Implement the project architecture and search for open source editor api's. Code for the architecture.Work on the front-end of the IDE. Integrate the work with sugi.
Aug 31, 2010 First day of the Cs298 Start building the database structure for creating new projects on cakePHP Need to create database and come up with a sample project with new projects created.
May 13, 2010 Showed the updated hard copy of the cs297 report and CS298 proposal. Gave few more suggestions on the report and approved CS298 proposal. work on the cs297report.
May 12, 2010 Showed the updated hard copy of the cs297 report and CS298 proposal. Gave some more suggestions on the report and proposal and asked to update all the links on the website. work on the cs297report and update all the links on the website and check for validation.
May 05, 2010 Showed the hard copy of the cs297 report. Gave some suggestions on the report and asked get proof read from writing center. work on the cs297report and modify it with Prof's suggestions.
Apr 28, 2010 Showed drag and drops project deliverable 4. Gave the the feedback and asked to improve the drag and drop functionality. work for drag and drops and work on the cs297report.
Apr 21, 2010 Showed drag and drops project. Gave the last date to submit the report May 3rd work for drag and drops also on the deliverables.
Apr 14, 2010 Showed navigation bars developed for the ide. Work more on the drag and drop. work for drag and drop of the elements.
Apr 7, 2010 Showed the layout developed for the ide. gave suggestions on the layout. work on the navigation bars.
MAR 31, 2010 Spring Break. Spring Break. Spring Break.
MAR 24, 2010 presented the drag and drop project(deliverable 3). Explained how the final IDE should look like and asked to start working on it. Build the basic layout of the IDE
MAR 17, 2010 showed the demo of the improved drag and drop project developed. Suggested to implement something that access does. Build a tree structure, demo the access ppt, and implement in jquery.
MAR 10, 2010 Showed the demo of the drag and drop project developed. Suggested to develop the objects using the JS and also draw the line just by using drag and drop. work on the jQuery to accomplish the above suggestions.
MAR 3, 2010 Presented the performance test results. write a report on the performance results and start working on the drag and drop which have two objects and should be able to exchange the properties. work on the report and develop a drag and drop in jquery.
FEB 17, 2010 Presented the Deliverable 1- Book collection and submitted the code. Try Yslow for checking the time taken to load the page, also try how to test the firefox memory usage and also come up with some quantitative way of measurement of efficiency of Jquery,YUI,scriptaculous, prototype and or DOJO. Should start working on the performance testing.
FEB 10, 2010 Presented the cakephp tutorial presentation and showed a demo project. Work on the deliverable one. Work on the library collection project.
FEB 3, 2010 Assigned Deliverable 1 which is to develop a web page for library collection on cake PHP and also discussed about how the final project should look like. Asked to prepare a ppt on cake PHP tutorial . do the ppt on CAKEPHP and work on Deliverable 1.
JAN 27, 2010 Dr.Pollett has created my account and showed how to upload the files. Asked to upload the project proposal, write a brief Bio about self and start learning PHP. Learn PHP and do some example in CAKEPHP